/
MOT CHECK Validity

MOT CHECK Validity

It is possible to set the calculation of MOT validity for 1. MOT inspections.

In order to automatically calculate the validity date of the EK/TK it is necessary to fill in the "First Registration Date" and set it in the new MOT Deadlines table.

MOT deadlines depend on the legislation of the country.

For homologation classes O1 trailers for braked and unbraked trailers, two codes must be entered into the Homologation classes - O1B for braked trailer and O1N for unbraked trailer - in order to set different settings.

Definition of MOT check deadlines

To calculate the 1st MOT check, the user sets deadlines in the table Definition of MOT Inspection Periods.

Field:

  • Code

    • The user enters the marking of the MOT inspection period with a unique code

  • Homologue filter. class (Homologation Class Filter)

    • The user selects a specific class from the Homologation Classes table, for which he enters the deadline

    • Can select more than one class. The system separates the individual classes with the character "|"

  • Homologation Class Description

    • The user can enter description text

  • Usage Method Filter

    • The user selects from the Methods of Usage of the Object table

    • Can select more than one way to use the item. The system separates the individual methods with the "|" character

  • Engine CCM From

    • The user can set the lower limit of the engine capacity for which the setting is intended

  • Engine CCM To

    • The user can set the upper limit of the engine capacity for which the setting is intended

  • Max. Construction Speed From (Max. Construction Speed From)

    • The user can set the lower limit of the speed in km/h for which the setting is intended

  • Max. Construction Speed To (Max. Construction Speed To)

    • The user can set the upper limit of the speed in km/h for which the setting is intended

  • First Term (Years)

    • User enters the number of years for the 1st MOT check period

  • Valid From

    • The user can specify the beginning of the validity of the settings for the row

    • If the field is empty, the setting on the row from the bottom is indefinite

  • Valid To

    • The user can end the start of validity setting of a given row

    • If the field is empty, the setting on the row from the top is indefinite.

The use of the table Definition of MOT Inspection Deadlines on the Object Card is described in the documentation Financed Object – Service tab.

 

Related content