Basic Description Of Variant
The user can make some changes in the so-called calculation variant (the Change Type is Calculation Variant=A). The calculation variant is approximately the same functionality as change copies, the differences are described below.
A user can create more than one Calculation variants. Subsequently, one of these variant calculations is selected and activated (transferred) to the contract. It is possible to make a change in the calculation variant without a change copy, regardless of the status and detailed status.
It is not possible to create the following from the variant:
Change Copies
Other variants
Create Invoice
Posting and canceling a payment.
It is not possible to create a variant:
from the original contract, if there is a change copy for it,
from a change copy.
Creating a variant is described below.