Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Automatically translated by Lango

...

  • If the technical improvement is financed by the customer, the leasing company only grants consent to the execution or asks for inclusion to be included in the insurance (accident insurance). We will not describe this case further.

  • If the technical improvement is financed by a leasing company, this technical improvement enters into the financing (annuity) and accident insurance at the moment of execution, i.e. the payment is changed. The process is described below.

    • With this method, the depreciation of the object may also change, depending on the value, the processes of the leasing company, and all this with regard to the accounting regulations of the given country.

...

This chapter applies only to contracts with Financing with servicesServices=YES (i.e. for operational leasing with services) when the object or additional equipment of the object is ordered by the leasing company. In the case of a technical evaluation, and if we want to generate an order for a given technical evaluation, it is necessary to insert create this technical evaluation into in the additional equipment of the item. It is then possible to generate a purchase order on it (description Object Purchase Orders Nákupní objednávky předmětu).  And  and upon receipt of the invoice, make the actual change (technical evaluation) to the contract.

...

If Change via Change Copy is set in the Detailed Status, the Change Contract Wizard with Change Object Type – Object Change will start:

  • Then, on the change copy or variant, open the Financed Object card, then Object Component/Price and Equipment.

  • Then use click on the Additional Equipment button to open the Additional Equipment overview of the item. Creates a new row in the report by entering the necessary data one by one.

  • On the a new line, the system has set the non-editable flags Technical Evaluation = Yes and Include in Financing = No, because Technical Evaluation is performed if the contract status is Active.

When the loadout is completefinished, the list closes and returns to the Item Prices form:

  • On the Financed Financing Object Prices page, press the Finish. The prices on the Additional Equipment tab and the Recap tab will not change, as the device is not yet included in the financing.

  • The system closes the form (tab).

Then the user transfers performs the transfer of the change copy/variant.

After transferring the change copy, it is possible to create an order (for a detailed description see Object Purchase Orders Nákupní objednávky předmětu). An order can also be created for a vendor identical to the object vendor of the item. This is only possible for additional equipments equipment that are is marked as Technical Evaluation = YES and the contract status is Active.

On an Active Contract without a Change Copy in the Object Item Overview, the user starts the Create Order function. After creating an order, the system displays the following a message:

...

The system has created an additional equipment order (it can be opened, for example, from a financed object). For a description of working the labour with the order, see Object Purchase Orders Nákupní objednávky předmětu. After creating the order, the system wrote the order number on the additional equipment line.

...

Doing technical evaluation

The technical evaluation can be carried out by Technical evaluation is possible with a special guide - object no. 4046869. The user initiates starts the execution of the change by clicking on the Change Contract (Wizard) process described in Contract Changes - Change Copies/Variants Změny smlouvy - změnové kopie / varianty , then selects the Change Type for Technical Evaluation with Wizard Object Numbernumber wizard=4046869.

Info

If the additional equipment was ordered by a leasing company, the actual technical evaluation will be carried out after the delivery of the additional equipment (installation assembly on the financed object) or after receiving an invoice from the supplier.

If this type of change has been selected, the Change Contract Purchase Price Wizard will start be launched after completing the Change Copy/Variant Wizardcopy/variant wizard is completed. The steps are as follows:

...

Info

The automatic renewal mode is only used for contracts with services (operating operational leasing and fleet management), not for other contracts.

...

  • Financed Object No.

    • If it is a single-object contract, then the system will tighten the number of the financed object and the field is non-editable

    • If it is a multi-subject object contract, then the user selects the subject manually, the field is editable

  • Change Effective as of Date

    • The system will add the date from the payment calendar. This is the date in the "Date From" field from the first unposted line

    • After clicking on the date, the system will open the payment calendar

  • Approval No.

    • If the product type has the flag "Mandatory Technical Evaluation Approval=A" (typically for operational leasing and fleet management), then:

      • Editable

      • Selects the user from the service permissions, Lookup to the list of service permissions, filtered to the contract number.

      • Mandatory, when moving to the next step, the system checks that the field is filled in

      • Note: it is used in operating leasing

    • If the product type has the a flag "Technical Evaluation Mandatory Approval Required=N", then:

      • Non-editable

      • Note: for financial leasing, credit, instalment sale

  • Endorsed

    • After selecting the Approval number from the service permission, the OC will automatically downloads retrieve the Approver ID value (30) from the maintenance permission Maintenance Permission Header (4026710) table

  • Object Additional Equipment

    • The system will automatically fill in the equipment code Equipment Code of the item if there is exactly one additional equipment based on the item for technical evaluation.

Buttons in step 1/3:

  • Back - Inactive

  • Next – when pressed, the OC will performs (will does not execute) the check of the Approval No. field

    • If the product type has the flag "Technical Evaluation Approval Required=A", then:

      • The OC checks to see if the Approval No. field is filled in:

        • If not, it will display the message "Approval number not filled in"

          • After pressing OK, it closes the message and leaves step 1/3 of the wizard open.

        • If so, it continues to the next wizard step.

    • If the product type has the flag "Technical Evaluation Approval Required=N", then:

      • After pressing the Next OC button, the OC check does not check fill in the field and continues to the next check.

    • If more than one trim is available as an additional equipment is ready, the system will display an informative message when moving you move to the second step: "More additional equipment is ready."

  • Finish - Inactive

  • Close – When when pressed, the OC will ask "Are you sure you want to quit close without saving?"

    • If the user confirms Yes, the OC closes the message, closes the wizard and leaves the contract open on the change copy/variant (depending on where the wizard was started launched from)

    • If the user confirms No, the OC closes the message and leaves the wizard open for the given step.

...

  • Vendor No.

    • Empty by default

    • For Financing with services=N, the field is non-editable (there is no point in selecting it, because it is not saved in this case)

    • For Financing with servicesServices=A:

    • Lookup to Suppliers. Selects a user if they want to specify a vendor

    • Non-editable if:

      • There is Is there an additional equipment for an item that has a Technical Evaluation = Yes and at the same time Technical Evaluation Processed = No

    • Editable if:

      • There is no additional equipment for the item on which it is Technical Evaluation = Yes and at the same time Technical Evaluation Processed = No

  • Vendor Name

    • For Financing with services=N, the field is empty and uneditablenon-editable

    • For Financing with servicesServices=A:

      • If the Vendor No. has been selected, the Vendor Name will be completed automatically and the field will become uneditable

      • If the vendor number has not been selected, the user can enter the vendor name, the field is editable.

  • Additional Equipment Code

    • For Financing with services=N, the field is empty and uneditablenon-editable

    • For Financing with servicesServices=A:

      • Non-editable if there is additional equipment for of the item on which it is Technical Evaluation = Yes and at the same time Technical Evaluation Processed = No

      • Editable if there is no additional equipment for the item on which it is Technical Evaluation = Yes and at the same time Technical Evaluation Processed = No

        • Lookup to the Additional Equipment table.

      • If the additional equipment is not ready and is in the dial, the user can select it

  • Technical Valuation Description

    • If the an Additional Equipment Code is filled in, the Description will be drawn automatically from the given additional equipment. The description is always editable.

    • If the user has not selected the Additional Equipment Code, the description can be entered manually.

  • Amount of Technical Valuation (excl. VAT(LCY))

    • For Financing with servicesServices=N, the field is empty and the user enters the value manually

    • For Financing with servicesServices=A:

      • if If there is additional equipment for of the item on which the it is Technical Evaluation = Yes and at the same time Technical Evaluation Processed = No:

        • The the sum of the values of the additional equipments that meet the conditions described above

        • field is non-editable

      • if there is no additional equipment for the item on which it is Technical Evaluation = Yes and at the same time Technical Evaluation Processed = No:

        • If Additional Equipment Code has been selected, the value is completed automatically (if it is entered on the Additional Equipment) and the field is editable

        • If the Equipment Code has not been tightened, then the field is editable

        • In case of manual change, the Amount of Technical Valuation (excl. VAT)

    • The value of technical improvement must not be left blank

  • Currency Code

    • The system fills in the currency code of the contract if the contract is in a foreign currency

    • Field The field is non-editable

  • Exchange Rate

    • The system automatically fills the Exchange Rate of the Contractcontract.

    • If there is additional equipment for the an item on which the it is Technical Evaluation = Yes and at the same time Technical Evaluation Processed = No:

      • If there is one matching rowline, the course will take over pick up from herethere

      • If there are multiple matching lines, it keeps the exchange rate of the contract remains

      • Non-editable field

    • if there is no additional equipment for the item on which it is Technical Evaluation = Yes and at the same time Technical Evaluation Processed = No:

      • By default, it complements will complement the exchange rate of the contract

      • editable, when changed manually, the system calculates the value Amount of Technical Valuation (excl. VAT).

      • course. The system will then records also record the course on the new additional equipment.

  • Amount of Technical Valuation (excl. VAT))

    • if there is additional equipment of the item on which the Technical Evaluation = Yes and at the same time the Technical Evaluation is processed = No:

      • sum of the values of the Additional Equipment List Price Excl.VAT (21) from API Object Add. Equipment (4026674) that meet the conditions described above , in the contract currency

      • field is non-editable

    • if there is no additional equipment of the item object on which the Technical Evaluation = Yes and at the same time the Technical Evaluation is processed = No:

      • The Will the system automatically calculatescalculate:

        • Amount of Technical Valuation (excl. VAT)=Amount of Technical Valuation (excl. VAT)(LCY)/Exchange Rate

      • The same is calculated in the event of a change in the Technical Evaluation Excl. Valuation without VAT (LCY) or a change in the Exchange Rate:

      • The When changing, the Amount of Technical Valuation (excl. VAT)(LCY)

      • Editable

  • Include in Financing (Y/N)

    • Default A

    • Changes user to N if technical improvement is not to be included in financing

  • Add into Insurance

    • Default A.

    • Changes user to N if technical improvement is not to be included in insurance

  • Add into Insurance Excl. VAT

    • By default, N.

    • Changes the user to A if he/she wants to include the price of technical improvement in insurance including VAT

  • Add into Depreciation

    • Default N

    • Changes the user to A if he wants to include the change in the acquisition cost in the asset's depreciation

  • Total Residual Value Calculated

    • The OC will display displays the value of the current residual value from the financing contract

    • Non-editable, informative information

  • Technical Improvement Residual Value Excl. VAT (Technical Evaluation Residual Value Exc.VAT)

    • Non-editable

    • In the wizard, the system extracts the value before technical evaluation from the field of the same name from the subject

  • Residual Value Change (Residual Value Change)

    • Empty by default

    • For Financing with services=N, the field is empty and uneditablenon-editable

    • For Financing with servicesServices=A:

    • Enter the value if the user wants to increase or decrease the residual value in the calculation by the residual value of the technical improvement

  • Residual Value excl. VAT (Calculation Residual Value)

    • Non-editable field

    • For Financing with services=N, field is blank

    • For Financing with servicesServices=A:

      • Calculates the OC automatically as the sum of Total Calc. Residual Value + Technical Evaluation Residual Value Excl. VAT + Residual Value Change

      • This value will also be included in the payment calculation

  • Include stayremain. Value To Assets

    • For Financing with services=N, the field is non-editable

    • For Financing with Services =A

    • Default N

    • Change Changes user to A if he wants the change of residual value to be included in the asset

  • Change Effective as of Date

    • Fills in the NAV automatically, it is the date of the next unposted payment

    • Non-editable by the user

    • After clicking on itWhen clicked, the contract payment calendar will openopens.

Buttons in step 2/3:

  • Back - Inactive

  • Next – when pressed, the OC will check:

    • CZ localization only (Luxury Tax):

      • The system evaluates whether it is an appreciation that has an impact on the unclaimed part of VAT. The criteria for the unclaimed part of VAT are as follows:

        • Handover Date in Contract => "VAT Limitation Valid From" (set in OneCore Settings) and

        • Financing Type= Operative Leasing and

        • Catalogue Group Course Code of the course has "Maximum price for VAT"<>0

        • The value of the "Calculate limitation for VAT" field in the Financed Object Metod Usage table (if the value is YES, then it meets the criterion for the unclaimed part of VAT)

      • Purchase Price Excl.VAT+Amount of Technical Valuation (Excl.VAT)=< Maximum price for VAT from the group of the object item catalogue card group and at the same time there is no calculation input for the unclaimed part of VAT in the original contract

        • Then it continues.

      • Purchase Price Excl.VAT+Amount of Technical Valuation (Excl.VAT)=< Maximum price for VAT from the group of the object item catalogue card group and at the same time there is a calculation input for the unclaimed part of VAT in the original contract

        • Then it displays a message

          image-20240620-083803.png
        • And they won't let it go on

      • Purchase Price Excl.VAT+Amount of Technical Valuation (Excl.VAT)> Maximum price for VAT from item catalogue group

        • Then it displays a message

          image-20240620-083932.png
        • And won't let it go any further

    • Checks if the technical valuation price is entered:

      • If it is not, it will warn you with the message: "Please enter the price of the technical valuation."

      • If it is, it proceeds proceed to step 3/3.

  • Finish - Inactive

  • Close – when pressed, the OC will ask "Do Are you sure you really want to quit close without saving?":

    • If the user confirms Yes, the OC closes the message, closes the wizard and leaves the contract open on the change copy/variant (depending on where the wizard was started launched from)

    • If the user confirms No, the OC closes the message and leaves the wizard open for the given step.

In Step 3 all the information is summarized, the user only confirms Finish.

...

  • Checks if the Adjusted Residual Value exclExcl. VAT is less than (Principal balance at the effective date Balance as of Effective Date + Technical Improvement Price exclExcl. VAT).

    • If it doesn't fit, it gives a message and stops the process. After confirming the message, it leaves step 3/3 open

    • If it passes, it continues to the next check.

  • If Financing with servicesServices=A (OPL and GMP):

    • Updates the line of previously created additional equipment

      • Flag Include in Financing, Technical Evaluation Processed=A

      • Date of entering the calculation = Effective of the change.

      • Other fields "residual value of technical evaluation without VAT", "change of residual value" Y/N and according to the input of the fields of the same name from the wizard.

    • If the user did not have an created unprocessed additional equipment created before starting the wizard, he creates a new row line of additional equipment in the Object Additional Equipment table (the Price and Equipment button opens the Financed Financing Object Prices form, with the there is a button Additional Equipment button on it), and adds the values

      • Additional Equipment Code, Description, Vendor No., Vendor Name – fill in to be completed from wizard

      • List Price Excl. VAT (LCY) and Price Excl. VAT (LCY) are is added from the Technical Valuation Price Excl. VAT (LCY) field from step 2/3

      • List Price Excl. VAT and Price Excl. VAT will be added from the field Technical Valuation Price Excl. VAT from step 2/3

      • Include in to financing will be set according to the same name field from the wizard

      • Sets Technical Evaluation=A

      • Technical Evaluation Processed=A

      • Other fields "residual value of technical evaluation without VAT", "change of residual value A/N and according to the input of the fields of the same name from the wizard.

      • The Leave the other fields (Discount %, Discount Excl. VAT (LCY), Discount Excl. VAT, Discount Incl. VAT (LCY), Discount Incl. VAT) are left blank

    • if Include in financing Financing = A in the Item Additional Equipments tab of the item:

      • adds fields Additional Equipment List Price Excl. VAT (LCY), Additional Equipment List Price Excl. VAT, Additional Equipment Price Excl. VAT (LCY) and Additional Equipment Price Excl. VAT from Object Additional Equipment 

      • Updates the residual values from the subject Object to the contractContract:

        • The Calculation Residual Value field (33) on the contract is filled with the value from the Calculation Residual Value (10230) from the subject and

        • The Calculation Residual Value % (4026700) field on the contract is populated with the value from Calculation Residual Value % (10235) from the subject

      • Continues on to calculation input

    • if Include in Financing=N in the Item Additional Equipments tab of the item :

      • Additional Equipment List Price Excl. VAT (LCY), Additional Equipment List Price Excl. VAT, Additional Equipment Price Excl. VAT (LCY) and Additional Equipment Price Excl. VAT do not add to an item from the additional equipment.

  • If Financing with servicesServices=N (FL, UV, SP):

    • does not add the line to Additional Equipment will not be added.

    • Proceeds to the calculation input.

  • Independently of the flag Financing with services=Y/N, it creates a new calculation input is created according to the setting of the Technical Evaluation Calculation Input Code technical evaluation on the Financing Product or the values from the wizard for the given subject of the contract:

    • From the code of the calculation input type, it getspulls:

      • Calculation Input Variant

      • Calculation Input Type

      • APR

    • In the Base Amount field (30) field, fill in add the value Technical Valuation Price excl. without VAT

    • Adds some additional data to the calculation input depending on the Include in Financing flag:

      • If the flag Include in to Financing=A flag was enabled in the wizard:

        • To the acquisition (40) adds A

        • A is added to To the calculation (70) adds A

        • Local (75) will be supplemented completed by A

        • IFRS (80) will be supplemented by A

        • Date of entering the calculation (90) will be filled in by date from z (Change effective as of date)

        • Inclusion Date (45) will be supplemented replaced by Date Z (Change Effective as of Date)

    • If the flag Include in financingto Financing=N was in the wizard

      • To the acquisition (40) adds N

      • N will be added to the calculation (70)

      • Local (75) adds N

      • IFRS (80) will be supplemented by add N

      • Date of entering the calculation (90) will be filled in by the date from Change Effective effective as of Datedate

      • Inclusion Date (45) will be added by to the Date of date from Change Effective as of Date

      • They will include it in the calculation of financial indicators (79040) and add N

  • Fills in the "To depreciation" field according to the settings in the wizard

  • Adds some additional data to the calculation input depending on the Include in Insurance flagfeature:

    • If the flag Include in insuranceto Insurance =N flag was in the wizard:

      • Insurance (55) will add N

    • If the Include in to Insurance flag =A flag was in the wizard:

      • Insurance (55) will add be supplemented by A

    • If it was included in the wizard Include in insurance without Insurance Excl. VAT=A wizard filled in the field Insurance amount inclAmount Incl. VAT (60) it will fill in field, the value N will be filled in

    • If the Include in Insurance Excl. VAT wizard ==N wizard in the Insurance Amount Incl. VAT field (60) field, it will fill in the value A

  • Recalculates (updates) the calculation input to recalculate other data (e.g. VAT Amount, Insurance Amount, Calculation Amount, etc.).

  • If the calculation input is Include in Financing=A:

    • In the financial calculator and the payment calendar of the contract for the last posted and non-credited payment, it adds the value of the technical improvement is added to the Acquisition Purchase Price Change field and this is included includes it in the principal.

  • If Include in Insurance=A:

    • The system checks the value of the Do not update insurance value Not Update Insurance Value field on an insurance contract with product type Product Type = Property. If its value is

      • No

        • Proceeds to the next checkreview

      • Yes          

        • Displays a message to the user

          image-20240620-084633.png
        • After confirming OK confirmation, the system continues without making any changes to the insurance contracts (termination of the insurance contract and creation of a new one). After completing the wizard, the user terminates the original "property" insurance contract manually and creates a new one with the required insurance value

    • If the check is Security Check = YES in the insurance settings Insurance Settings and the check is not turned off disabled on the insurance contract (i.e. flag Do Not Check Security=NO), the check will be performed to see if it will check whether the new sum insured complies with the security:

      • If the sum insured is increasing increased and the security of the object is tied linked to the sum insured for the insurance company's product for the given insurance contract, it must check the new sum insured (original sum insured + amount from the new calculation input) and the basis for security.

        • If it does not comply , after increasing the security, it is not suitable, the warning "There are not enough Insufficient security devices on the object" will follow.

        • If the security is satisfactory, it continuesproceeds

      • If Security Check = NO is set in Insurance Settings or if Do Not Check Security Check Ensure = YES is disabled in the insurance contract settings, OC will not check the sum insured against the security.

    • It checks whether the insurance contract with the new insured value complies with the restrictions of the insurance variant (Note: we do not check the valid rate as of the current working date, because the rate should not change when increasing if the insured value is increased on an the existing insurance contract):

      • If so, it continues the process.

      • If it does not meet any restrictive condition, it will display the message "The insurance contract does not comply with the restrictions. Do you want to terminate non-compliant insurance policies?". If you press Yes, it will terminate the non-compliant insurance policies one the day before the effective date of the technical evaluation.

        • If an unsatisfactory rate is included in the package, it will be followed by a the warning "You also need to terminate the insurance policies in the package – do you want to continue?". If the answer is YES, it will terminate the insurance policies with an unsatisfactory rate as well as the tied insurance policies. The After completing the wizard, the user must then enter a new insurance policy after completing the wizard on the change copy/variant. If the answer is NO, the OC will terminate terminates the technical evaluation process, close closes the wizard and leave leaves the contract unchanged on the change copy/variant.

        • If the unsatisfactory rate has an additional insurance policy linked to it, it will be followed by a warning will follow: "Tied insurance policies also need to be terminated "You need to terminate the tied insurance policies as well – do you want to continue? If the answer is YES, it will terminate the insurance policies with an unsatisfactory rate as well as the related linked additional insurance policies. The After completing the wizard, the user must then enter a new insurance policy after completing the wizard on the change copy/variant. If the answer is NO, the OC will terminate terminates the technical evaluation process, close closes the wizard and leave leaves the contract unchanged on the change copy/variant.

      • When you press NO is pressed, the fuse does not exit, it terminates the wizard process

  • If Include in Insurance=N:

    • It does not perform the check – there is no need because the sum insured does not change.

  • Performs/does not copy a property insurance contract:

    • If the flag was in wizard Include in Insurance=Yes

      • The original insurance policy, where the calculation is a percentage of the sum insured (e.g. property insurance has a base code in the Insurance Contract table and the 460 Insurance Value field), is terminated one the day before the effective date of the technical evaluation and a new identical insurance policy with an increased sum insured from the effective date of the technical evaluation is created (by copying).

    • With In the case of individual property insurance, the system also terminates the original policy and establishes a new one with an increased value. (Note: the user should secure a new pledge from the customer for the increased sum insured – additional insurance of technical evaluationimprovement.)

  • If the flag was in wizard Include in insuranceInsurance=N

    • They do not terminate the The original insurance contract or create is not terminated, a new one is not established

    • Recalculates the contract

    • if the technical improvement has been included in the financing, its value will be included in the Purchase Price excl. VAT after it has been performed(Purchase Price excl. VAT) in the contract.

    • Leave the contract on the change copy/variant, after checking it is necessary to transfer it to the original.

Note

If there is a new insurance policy on the framework agreement Insurance Verification Required = Yes, it needs to be run over the new fuse Verification of the poj.